Faka Union Pump Station, SOUTHERN GOLDEN
GATE ESTATES, FLORIDA

M&E Construction Services for Everglades & Picayune Restoration

 70c2f7b32e09ca1957535d8aff39c18f.jpg

Project Description:

The Picayune Strand Restoration Project, Faka Union Pump Station and Levees, Canals and Roads (referred to Project) is part of the Comprehensive Everglades Restoration Plan (CERO). The Project will help to restore the area known formerly as the Southern Golden Gate Estates to it pre-drainage hydrology and ecology, generating positive effects on the hydrology, vegetation and wildlife of the Project area and surrounding public lands. The Project consists of a pump station, tie-back levees, spreader beams and canal plugs which will slow water flowing through existing canals and redistribute it across the landscape.

The construction of the Pump Station, which shall have 3-100 cfs pumps and 6-470 cfs pump, for a firm capacity of 2,650 cfs and 9 bays.

Mechanical equipment will include diesel engine and electric motor driven pumps, traveling trash rakes, bridge cranes, standby diesel generators, vacuum priming systems, HVAC equipment, cooling water pumps, fresh water pumps, water treatment equipment, lubricating water equipment, potable water equipment, and other miscellaneous mechanical equipment.

Electrical and Instrumentation equipment will include station power distribution systems, station switchgear, motor control centers, local and station programmable logic controllers to control and monitor all ancillary mechanical equipment, grounding cable system, lighting, Control Room Operator Work Station with monitoring and control computers, uninterrupted power service equipment, remote terminal unit system, all supporting switches, wiring, conduits, junction boxes, etc. to interconnect with equipment for control and monitoring.

The Contractor shall furnish and install an 80 foot radio antenna tower. The Contractor shall provide and install the antennas and Remote Terminal Units at the pump station.

Construction of the station will include excavation, station substructure, backfill, fully enclosed buildings for the equipment, access bridges, fuel storage areas with containment and all associated equipment, sanitary facility, approach and discharge canals, retaining walls, trash racks and related civil work.
The work will also include the pumping stations; approach and discharge canals.

Contractor shall construct tie-back levees, spreader berms and canal plugs. Contractor shall remove existing roads. Road degradation shall include vegetation removal and disposal, including burning, subject to permit requirement. Contractor shall be allowed access through existing I-75 temporary access.

 
 


GENERAL CONTRACTOR:
Harry Pepper & Associates, Inc.

 

Harry Pepper & Associates - Technical solutions, Relationships, Quality Service, Value Engineering, Experience, Project Schedule & Coordination, Expertise

 

case_box.gif Design/Build
case_box.gif Bid Build
case_box_check.gif New Construction
case_box.gif Retrofit/Renovation
case_box_check.gif Electrical Construction
case_box_check.gif Mechanical Construction
case_box.gif Facilities Services
case_box.gif Consulting Services
case_box_check.gif HVAC Services

Project Profiles

  • Current Projects
    • Bayou Meto Pump Station
    • Compartment C Buildout Inflow G-508
    • Faka Union Pump Station
    • Merritt Pump Station
    • Picayune Strand Restoration
  • NAVFAC
    • Air Traffic Control Tower
    • Airfield Parking Apron
    • Building 846
    • Buildings 40, 603, 2683, and Barrancas Recreation Field
    • Child Development Center
    • Hangar A-936
    • Littoral Warfare Systems Facility
    • P315 Joint Aquatic Diver Training Facility
    • Renovation/Repair of Dock 146
    • Repair Alter NAS BEQ 1350 & 437
    • Repair Base Operations Facilities
    • Repair BEQ 3703 & 3704
    • Repair BOQ Housing Units
    • Repair Buildings 511 - 514, 516, & 3783
    • Repair Buildings 1099 & 3744
    • Repair Hospital & Outlying Facility
    • Repair Visiting Quarters 438 & 439
    • Restoration and Modernization of Water Treatment Plant
    • Security Gate Improvements
    • USMC Support Facility
  • U.S. Army Corps of Engineers
    • Bankhead Lock & Dam
    • Herbert Hoover Dike Culvert Project
    • IOP Emergency Contract
    • Kissimmee River Structure 68A
    • S-331 Command and Control Center
    • Seminole Indian Reservation Restoration Project
    • Shoreline Stabilization Project Section III
    • Surface Facility for Lake Okeechobee ASR Pilot Project
    • Temporary Pump Station 332B
    • Three Bay Obermeyer Hydro
    • Water Treatment Plant Moody Air Force Base
  • MWR
    • Golf Clubhouse at the Naval Air Station
    • Key West Marina Expansion
    • Youth Center Facility
  • Miami-Dade County
    • South District Wastewater Treatment Plant
  • South Florida Water Management District
    • Compartment C Buildout
    • Lake Trafford Critical Restoration
    • Pump Stations G-310 & G-335
    • Pump Stations G-434 & G-436
    • S-7 & S-8 Trash Rakes
    • S-127 Pump Station Hardening
    • Stormwater Treatment Area 1 West
    • Stormwater Treatment Area 6 Sec 2 & Sec 1
  • South West Florida Water Management District
    • Wysong Adjustable Water Conservation Structure
 

Harry Pepper & Associates

  • Contact
  • Services
  • News
  • Careers

EMCOR GROUP, INC.

  • About Us
  • Locations
  • Investor Relations
  • Corporate Social Responsibility
©2021 EMCOR Group Inc.

Privacy Policy | Sitemap

NYSE: EME