Wysong Adjustable Water Conservation Structure,
Sumter County, FL
Construction Services

SCOPE OF SERVICES
Harry Pepper provided construction services for the removal and replacement of old lock and dam facilities. An entire river crossing was dewatered, with the exception of the lock, utilizing 500 LF of sheet pile wall. In addition, a new lock and dam control house was constructed along with a boat ramp and associated site work.
This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries ("EMCOR"). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2011, EMCOR Group, Inc., All Rights Reserved

