P596 Auxiliary Support Complex, Naval Submarine Base, Kings Bay, GA

Construction Services: Fire Protection & MEP Systems

SCOPE OF SERVICES

Provided construction services for a 40,788 SF Security Complex on diverse sites across NSB, Kings Bay GA, including an Auxiliary Reaction Force Facility (ARFF), an Armored Fighting Vehicle Operational Storage Facility (AFVOSF), an Armory, a Small Ordnance Magazine (SOM), and other facilities to support auxiliary security forces responding to incidents in the Strategic Weapons Facility Atlantic (SWFLANT) Limited Area, and NSB Kings Bay GA Waterfront Restricted Area. The ARFF supports an 80-man security force per shift; three shifts a day, and includes secure-parking for six Armored Fighting Vehicles (AFV). The ARFF is a single-story, ballistic-hardened, reinforced concrete structure. The roof is capable of supporting fighting positions and defensive weapon mounts. Meets all ARFP requirements. The ARFF is surrounded by a fence with security lighting, gates, and vehicle barriers. The ARFF includes fire detection, fire suppression, communication, electrical, plumbing, heating, ventilation, and air conditioning (HVAC) systems, and a food preparation and serving area. Built-in equipment includes complete galley equipment and ventilation equipment for the alert vehicle garage. The SOM is an earth covered, multi-cell box type magazine with reinforced concrete walls, roof and floor. The AFVOSF is a reinforced concrete structure for the ready storage of 30 AFVs. The facility has mechanical ventilation, lighting, and reaction force access/egress on all building sides. The Armory is a single-story, bullet-resistant reinforced concrete structure, including built-in racks for weapons storage, ready ammunition storage lockers, a weapons issue area, a weapons repair area with de-greasing and weapons cleaning tanks, and an outside covered pad for weapons cleaning.

PUBLIC / GOVERNMENT
MILITARY


GENERAL CONTRACTOR:

Harry Pepper & Associates, Inc.

CLIENT:
United States Navy
910 Hunley Road
NSB Kings Bay, GA 31547
Contact: Steve Yawn
Phone: 912.573.4695

PROJECT DURATION:
Oct 18, 2007 – May 27, 2009

CONTRACT AMOUNT:
$12,805,166.00

 

Harry Pepper & Associates - Technical solutions, Relationships, Quality Service, Value Engineering, Experience, Project Schedule & Coordination, Expertise

 

case_box.gif Design/Build
case_box_check.gif
Bid Build
case_box_check.gif New Construction
case_box.gif Retrofit/Renovation
case_box_check.gif Electrical Construction
case_box_check.gif Mechanical Construction
case_box.gif Facilities Services
case_box.gif Consulting Services
case_box_check.gif HVAC Services