Surface Facility for Lake Okeechobee ASR Pilot Project Kissimmee River Site, Okeechobee, FL
Construction Services: Central & Southern Florida Comprehensive Everglades Restoration
SCOPE OF SERVICES
Harry Pepper provided construction services for the 5 MGD surface water treatment facility for treating and injecting surface water from Kissimmee River into Aquifer Storage and Recovery (ASR) well. Major water treatment components, electrical work and controls. Process and water treatment equipment included 300 HP and 150 HP Vertical Turbine pumps, Tonka Pressure filter, two inline UV disinfection units, Raw Water Intake Screen and Hydroburst system, decant pumping stations and associated ponds, ductile iron piping and valves, stainless steel air piping, and misc. PVC piping to create water treatment process. Treatment and injection System included extensive monitoring and control equipment with provisions for remote operation.
This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries ("EMCOR"). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2011, EMCOR Group, Inc., All Rights Reserved






