Water Treatment Plant - Moody Air Force Base, Moody Air Force Base, GA
Design/Build & Construction Services

SCOPE OF SERVICES
This Design-Build services project was the first Nanofiltration Water Treatment Plant placed in service in the State of Georgia. The work included the construction of a facility containing two (2) membrane filtration skids with the capability of 1 MGD with fully automated controls, and with future expansion capabilities for two (2) more skids to provide a total of 2 MGD capacity. The work included demolition of the old cascading tray water and construction of new packed tower aerator. The work also required replacing three submersible deep well pumps and motors and installing a 600 amp breaker and service for emergency backup power.
This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries ("EMCOR"). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2011, EMCOR Group, Inc., All Rights Reserved

