Temporary Pump Station 332B, Dade County, FL
Design/Build & Construction Services

SCOPE OF SERVICES
This construction services project was a Design-Build procurement that was Designed and Constructed in 90 days. This pump station is built of structural steel. The mechanical equipment includes the following: 4 diesel engine driven 125 CFS pumps, 1 electric motor driven 75 CFS pump, 5 discharge pipes approximately 2,230 feet long each. The water is discharged into a 162 acre detention pond being built as part of the contract.
This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries ("EMCOR"). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2011, EMCOR Group, Inc., All Rights Reserved

