Seminole Big Cypress Indian Reservation, Hendry County, FL
Construction Services: Western Water Conservation Restoration
SCOPE OF SERVICES
Harry Pepper provided construction services for 10 miles of levee and canals, 14 gated control and overflow structures, 1 twinbarrel inverted siphon with inflow and outfall structures, 1 five-barrel equalization structure and 10 pump stations ranging in size from 12-42" within a project area of 700 acres. A dual pipe bypass Siphon was installed under the existing feeder canal.
This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries ("EMCOR"). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2011, EMCOR Group, Inc., All Rights Reserved





