Air Traffic Control Tower, Mayport, FL
Construction, HVAC & Electrical Systems Services
Project Description
Five story Air Traffic Control Tower with a single story Radar and Air Traffic Control Facility (RATCF). Demolition of one of the vacated facilities was completed eight months after construction of new facility after the Government relocated existing equipment into the new facility. The new tower provides accommodations for future SPAWAR and tower roof-mounted equipment. Removal of existing control tower cab and repairing the opening was completed after commissioning the facility. Facility included Air OPS Equipment, administrative, and training areas. Harry Pepper & Associates also provided emergency generator, UPS, HVAC systems, and electrical systems and raised access flooring in ATCT & RATCF structures.
This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries ("EMCOR"). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2011, EMCOR Group, Inc., All Rights Reserved





