Home
About HPA
Contact
Success Stories
Water Treatment
Wastewater Treatment
Civil/Environmental
Marine
Building - New/Renovation
Design-Build
Green/LEED
Current Projects
Water Treatment
Wastewater Treatment
Civil/Environmental
Marine
Building - New/Renovation
Design-Build
Green/LEED
Clients
Design/Build
Awards/Media
Career
E-Bidding Login
Success Stories
Littoral Warfare Systems Facility
Client : NAVFAC
The new structure is approximately 45,135 sf, standard two-story facility with high bays, administrative, and SCIF spaces within the structu
.... Read More
Entry Control Facilities at USMC Support Facility Blount Island
Client : NAVFAC
Design-Build Replacement of existing gate structures at both the rear and main entrances and installation of cable-reinforced security fenci
.... Read More
Design/Build Airfield Traffic Control Tower Naval Air Station
Client : NAVFAC
Design/Build . New construction of multiple buildings and improvements: Five story Air Traffic Control Tower with a sin
.... Read More
P596 Auxiliary Support Complex
Client : NAVFAC
Construct a 40,788 SF Security Complex on diverse sites across NSB, Kings Bay GA, including an Auxiliary Reaction Force Facility (ARFF), an
.... Read More
P598 Waterfront Security Force Facility NSB
Client : NAVFAC
Construct a 14,090 SF (approx.) Waterfront Security Force Facility (WSFF) within the NSB Kings Bay, GA waterfront restricted area (WRA). Th
.... Read More
S-331 Command and Control Center
Client : ACOE
This Design-Build Procurement included constructing a command and control building room to the SFWMD’s existing pump station S331 to provide
.... Read More
Kissimmee River Florida Project, Structure 68A
Client : ACOE
Project consists of constructing a water control structure on the Southeast side of Lake Istokpoga, adjacent to the existing 3-bay spillway,
.... Read More
South District Wastewater Treatment Plant, HLD Upgrade to 285 MGD, Temporary Field Office Facilities
Client : SFWMD
Construction of temporary field office facilities and related infrastructure to support a major expansion for Miami-Dade Water and Sewer Aut
.... Read More
P315 Joint Aquatic Diver Training Facility NSA
Client : NAVFAC
Design/Build – New construction of a 75’ long x 40’ deep training tank pool and Applied Instruction Building. The Dive Tank is a deep concre
.... Read More
Seminole Big Cypress Indian Reservation Western Water Conservation Restoration Project – Basin #1 and Siphon #1
Client : ACOE
Construct 10 miles of levee and canals, 14 gated control and overflow structures, 1 twin-barrel inverted siphon with inflow and outfall stru
.... Read More
S-127 Pump Station Hardening & Upgrades
Client : SFWMD
Construct new command and control building for controling and monitoring of remote pumping stations during hurricane events Microwave commun
.... Read More
Repair Base Operations Facilities NAS
Client : NAVFAC
This facility sustained storm and flood damage during Hurricane Wilma. This Design/Build project included mold remediation and asbestos aba
.... Read More
Youth Facility NAS
Client : MWR
New Design/ Build approximately 14,000 Square Foot. Single story building with five classrooms, computer room, administrative offices and a
.... Read More
Surface Facility for Lake Okeechobee ASR Pilot Project Kissimmee River Site, Central & Southern Fl project Comprehensive Everglades Restoration Plan
Client : ACOE
Construct 5 MGD surface water treatment facility for treating and injecting surface water from Kissimmee River into Aquifer Storage and Reco
.... Read More
STA 6 Section 2 Construction and Section 1 Modification Project
Client : SFWMD
Construction of a Stormwater Treatment Area that included land clearing, canal excavation, levee construction and degrading of existing road
.... Read More
Acme Basin Discharge C-1 Canal and Pump Station 7
Client : SFWMD
Project includes canal widening, construction of a 220cfs pump station, installation of 84 inch reinforced concrete culverts, road widening,
.... Read More
STA 1 West, Inflow Gates Automation
Client : SFWMD
Replacement of the manual hoist assemblies for the gates with motorized operators, electrical services, instrumentation and telemetry contro
.... Read More
196 BOQ Housing Units
Client : NAVFAC
This Design-Build procurement included Hurricane Wilma Repairs to 196 BOQ’s and Family housing Units and was completed in 150 days. The repa
.... Read More
Repair Building 1099, Corry Station
Client : NAVFAC
Design/Build project to repair outstanding deficiencies for Electronic Warfare Training Building 1099 including renovations to an 110,000 sq
.... Read More
Repair Bldgs 511, 512, 513, 514, 516, & 3783
Client : NAVFAC
Design/Build renovations of six each buildings five of which (Buildings 511, 512, 513, 514, 516) exterior appearance had to be restored to t
.... Read More
Serial 18-2 for Design/Build for Bldgs 40, 603, 2683, & Barrancas Recreation Field NAS
Client : NAVFAC
Design/build for Hurricane Ivan Repairs to buildings 40, 603, 683 and design and construct a new obstacle course and multi-recreational fiel
.... Read More
Golf Clubhouse at the Naval Air Station
Client : MWR
Design/Build new 18, 000 sf, low country style clubhouse at NAS JAX Golf Clubhouse. This included 10,500 sf dining and bar area, a full ser
.... Read More
Design/Build Airfield Parking Apron NAS
Client : NAVFAC
This project included construction of 35,122 sq meters of Portland Cement Concrete pavement for parking of P-3 aircraft at NAS Jacksonville,
.... Read More
Emergency Repairs to NAS Pensacola Hospital & Outlying Facilities (Hurricane Ivan)
Client : NAVFAC
Naval Hospital: Remove/Replace 18,000SF 2-Ply Mod Bit Roof and complete replacement of lightning protection system; Remove/Replace Gypboard
.... Read More
Repair BEQ 3703 and 3704 Corry Station NAS
Client : NAVFAC
Renovation and upgrading of BEQ to Navy 2+0 room berthing standards (occupancy: 116 people each building). Wet Pipe sprinkler fire protect
.... Read More
Repairs/Alterations to Visiting Quarters Bldg 438 & 439
Client : NAVFAC
Included design and construction to replace deteriorated structural, mechanical, electrical, and finish systems. Both are 3 story permanent
.... Read More
Shoreline Stabilization Project Section 111 Virginia Key
Client : ACOE
This project consists of demolishing and building 25 Timber groins ranging in length from 20 to 70 Feet, site improvements, importing of bea
.... Read More
S-7 & S-8 Trash Rakes
Client : SFWMD
This project involves the construction and installation of two (2) bridge mounted trash rakes, trash racks and the construction of service b
.... Read More
Bankhead Lock & Dam Black Warrior River
Client : ACOE
This project involved removal of two 250 ton miter gate leaves and transporting them downstream for disposition at a reclamation site. Two
.... Read More
Central & Southern Florida Ecosystem Critical Restoration Project, Western C-11 Basin Phase 2, Spillway 381
Client : ACOE
Construction of Three Bay Obermeyer Hydro, Inc. gated spillway with needle dams and service bridge intake and discharge basins and control h
.... Read More
Repair Alter-NAS BEQ 1350 & 437
Client : NAVFAC
Design/Build Renovation of 2 BEQ buildings, complete replacement of exterior walls and interior partitions, replace stairs, windows, doors,
.... Read More
Gate Improvement NAS
Client : NAVFAC
Design/Build NAS Jacksonville Gate Improvements Birmingham, Yorktown, & Commercial Gates. Renovation and hardening of all 3 gates for: compl
.... Read More
Hangar A-936
Client : NAVFAC
Design/Build Renovation of existing Hangar including: Structural Concrete Repairs, replacement of hangar doors, interior partitions, new of
.... Read More
Bachelor Enlisted Quarter (846) NAS
Client : NAVFAC
Design/Build Florida DBOC-Renovation of nine BEQ Buildings Repair existing damage to exterior skin, replace stairs, windows, doors, panels,
.... Read More
Marina Project-Phase II
Client : MWR
Design/Construct concrete pier supported by pre cast concrete pilings plus associated electrical and mechanical lighting work for the Boca C
.... Read More
Water Treatment Plant
Client : ACOE
This Design/Build project was the first Nanofiltration Water Treatment Plant placed in service in the State of Georgia. The work included d
.... Read More
North District Wastewater Treatment Plant-Decommission of Grit Chamber
Client : MDWSD
This project included decommissioning of the existing “Grit Chamber”, including: Demolishing interior tank walls and installation of 120 inc
.... Read More
Temporary Pump Station 332B/North Detention Area
Client : ACOE
Design/Construct new detention pond for Pump Station 332D. Modify two pump discharge pipes to place water into the new Detention Pond. This
.... Read More
IOP Emergency Contract Central and Southern Florida Project for Flood Purposes
Client : ACOE
This project was a Design-Build procurement that was Designed and Constructed in 90 days, and included: Design/Construction of Pump Station
.... Read More
Wysong Adjustable Water Conservation Structure
Client : SWFWMD
This work involved removal and replacement of old lock and dam facilities. An entire river crossing was dewatered, with the exception of th
.... Read More
Pump Station 361 Central and Southern FL
Client : ACOE
The work included construction of the pumping station concrete substructure and concrete superstructure, earth work associated with the pump
.... Read More
Marina Expansion & Bath House
Client : MWR
This project included construction of a full and complete marina pier system, including finger piers and “T” access pier at NAS, Key West.
.... Read More
Child Development Center
Client : NAVFAC
This project includes construction of a 18,273 square feet (occupancy: 176 children and 44 staff personnel) child development and playground
.... Read More
Pump Stations G-310 & G-335
Client : SFWMD
Construction of Pump Stations G-310 and G-335 consists of 48,000 cubic yards of reinforced structural concrete. The mechanical installation
.... Read More
Task Order 0001 for JIATF-East Warehouse
Client : MWR
This project includes a warehouse loading dock, a guard house, paved parking areas, roads and widening of roads, hydraulic operated slide ga
.... Read More
Temporary Pump Station 332B
Client : ACOE
This project was a Design-Build procurement that was Designed and Constructed in 90 days. This pump station is built of structural steel. T
.... Read More
Stormwater Treatment Plant STA-1 West-Works
Client : SFWMD
This project involved building a 7,000 acre stormwater treatment area. Included in STA-1W are more than 12 miles of canal and levee constru
.... Read More
Aviation Physiology
Client : NAVFAC
The work consisted of an addition to the existing Water Survival Training Facility. The additions included two stories of permanent constru
.... Read More
Structural Repairs to Building 868
Client : NAVFAC
This work took place in a large aircraft paint hanger. The work included repairing all cracks and spills in the floor, replace and provide
.... Read More